With the front finished it’s time to start assembling rear suspension components back onto the Elise. Pretty much the same as the front with a few small differences. Starting with these chassis brackets for the lower wishbones. A bit of corrosion block grease applied too. Right hand lower wishbone on. Upper one on. Damper mount. […]
elise rebuild
S1 Elise – Suspension Refresh – Fitting Front Hub Carriers, Camber Shims, Ball Joint Plinths, Steering Arms, Brakes, Disc Guards and Drop Links
Now the wishbones are on and the bolts all torqued up… …I moved on to assembling the rest of the front end. As usual with these things ‘refitting is the reverse of removal’. The ball joint plinths need fitting to the ball joints first. I used a bit of copper grease here to help prevent […]